Some news from Helsinki for a while! Three of the members of Komitu Architects, Noora, Tuuli and Inari were tutoring a workshop as part of the European Architecture Students Assembly EASA in Helsinki 16.7.-29.7.2012. The workshop was called Refuge and we were working together with the Hirundo center for European migrants and travellers.
30 July 2012
EASA Wastelands REFUGE workshop in Helsinki
Some news from Helsinki for a while! Three of the members of Komitu Architects, Noora, Tuuli and Inari were tutoring a workshop as part of the European Architecture Students Assembly EASA in Helsinki 16.7.-29.7.2012. The workshop was called Refuge and we were working together with the Hirundo center for European migrants and travellers.
02 July 2012
Social relations and bamboo swings

After nearly two weeks of absence KOMITU has returned to Phnom Penh and boy is it good to be back! Having recovered from the surprising culture shock and flue I caught on my return I was excited to visit the site. Unfortunately there hadn't been as much progress as we had hoped for due to some problems with material logistics etc. but I really saw the shape of the building for the first time with my own eyes today which was great!
18 June 2012
Sustainable Building -workshop with STT
On Saturday 9.6. we organized a workshop "Sustainable Building and Ecological Materials" together with ngo Sahmakum Teang Tnaut STT. More than 30 participants attended, most of them students from local universities Rufa and Norton. We went trough the most important phases in using bamboo and even got some practical experience of building the roof beams for the center.
13 June 2012
The manual timelapse: week 23 on site
Almost all of the footings are now in place and hopefully casting of the ground beam will be done still this week! KKYC, we're going up!
So long KKYC - hope to see you soon!
It was very wistful saying again goodbye to the great team of workers working for the realization of the youth center on the site! Hope to see you all soon!
Sisko will be staying in Phnom Penh for another week now and Elina will be coming back for July, but let's see how far the construction has got by then and if members from Komitu are still needed on site during the fall.
06 June 2012
Foundation work continues
Progress on site! This is a picture from the end of last week just before the few days holiday for the Cambodian communal elections. The brickwork forms a mold for the concrete ground beam which will probably be casted by the end of this week. And what's best about it that one can already start to see the shape of the building forming up!
04 June 2012
Welcome to workshop on KKYC site on Sat 9th of June!

Interested in learning about the use of bamboo in construction? And of the advantages of the compressed soil bricks compared to the commonly used red bricks? And how to design a building that keeps the spaces cool without an AC?
Welcome to workshop on "Sustainable Building and Ecological Materials" on Saturday 9th of June 2012 on the Kouk Khleang Youth Center building site! We have places for 25 participants so please sign in before hand by email to den(a)teangtnaut.org from STT or inari.virkkala(a)gmail.com and sisko.hovila(a) gmail.com from Komitu!
Casting the concrete footings
The footings are almost done! Due to the loose sand used for the filling as well as using mainly man power instead of machinery, it has taken a lot of time to finish the underground parts of the building. Even though it is nowadays raining almost every afternoon, we could prevent the footing pits turning into rainwater ponds by filling them soon after digging with riprap (large stones). Stones would be compacted and lay concrete casted on top to make the base for the actual footing. Hopefully things will start proceeding faster now that the toughest part is done!
30 May 2012
Restaurant day in Helsinki
A week ago on saturday Komitu held a pop-up restaurant in Helsinki to bring cambodian delicacies to taste. A lot of friends showed up and passers-by stopped to have a tasty meal or a refreshing smoothie with cambodian music to complete the experience. Both of the main dishes and smoothie choises were sold out before five and after the expenses some money was left to donate for the youth center project. The most important of course was that food and weather were good and we all had a wonderful Restaurant Day!
KKYC Construction Crew
From left: Phal (site implementation), Inari, Mom the II, Mom, Narin (site manager), Save, Na, Chaet, Pollaa, Peter (contractor), Sreng (site supervisor) and the Kids.
Missing from the picture: Van, Saa, Mie, Cheth
Komitu Architects proudly presents: KKYC Construction Crew!
To be accurate, the picture was taken on Monday this week (just before two people were picked up by scooter from their homes from a post-salary-day-sabbatical-leave). During the past few days our crew has expanded by 1-2 people each day – Thanks to the people, we are now progressing on gear 5! By a quick look to the site today, there are 6 men plus the site managers Pol and Sreng, and three women. We have now been able to form two teams:
- The bamboo team (the ladies) is in the middle of oiling the ready made bamboo beams and columns with a certain kind of vegetable oil.
- The concrete team (men) will continue with the footings work a few more days before starting the ground beam casting.